Working Group Title

Super brief Mission Statement qui dolorem ipsum quia dolor sit amet

Visit our members-only inet page

Working Group Purpose & Mission

Mission:

The Infrastructure Working Group Charter is to bring together designers, builders, operators and owners of economic and physical infrastructure systems to advance the application of systems engineering. This Working Group aligns with the strategic aim of INCOSE to advance the application of systems engineering outside its core aerospace and defense domain.

people6

Process Enablers

TechOps Domain

80

Members

2012

Established


Chair

Alain Kouassi

Co-Chair(s)

Marcel van de Ven

Laura Uden


Inquiries


Scope

This Working Group will address mostly physical infrastructure issues with a concentration on the construction of infrastructure facilities in the energy, transportation and, and communications domains. This includes public and commercial facilities and networks necessary for the economic and physical well being of society (e.g., power generation and distribution, waterways and ports, industrial plants, telecommunication networks, transportation facilities and systems, and mining). The Working Group will leverage international systems engineering best practices and produce documents to assist developers and builders of infrastructure systems. This Working Group will collaborate with other domain specific Working Groups such as the Transportation Working Group, the Power and Energy Systems Working Group, the Automotive Working Group, Critical infrastructure Working Group, Smart Cities Initiative, and the Resilience Systems Working Group.


Goals

  • To grow and fully integrate the CM discipline within SE including all relevant areas of SE (e.g. modeling and simulation-based approaches for SoS).
  • To develop a community of CM-specialists within INCOSE (pool of knowledge) through various efforts including, but not limited to: - Developing papers to be presented during International Symposia,
  • Establishing project specific working relations with other professional societies and institutions with like interests in CM; a living N2 document shall be maintained to show relationship to other CM focused organizations. ,
  • Advancing the body of knowledge regarding CM and its integration into SE and subsequently contributing to the SEBoK/SE Handbook,

Outcomes

    ,
  • Product - Modeling a Drawbridge: An MBSE Application to an Infrastructure Project
  • Product - Guide to the Application of Systems Engineering in Large Infrastructure Projects, Version 2.0
  • Product - A Metamodel for Infrastructure
  • Product - Trifold/ Leaflets of Systems Engineering application in the Infrastructure domain

IW23: International Workshop Focus

Neque porro quisquam est, qui dolorem ipsum quia dolor sit amet, consectetur, adipisci velit, sed quia non numquam eius modi tempora incidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quis nostrum exercitationem ullam corporis suscipit laboriosam, nisi ut aliquid ex ea commodi consequatur? Quis autem vel eum iure reprehenderit qui in ea voluptate velit esse quam nihil molestiae consequatur, vel illum qui dolorem eum fugiat quo voluptas nulla pariatur?

  • objective
  • key takeaway
  • et

 

Planned Activities

  • thing 1
  • thing 2
  • thing 3

Planned Work Products

  • product 1 - ETA
  • product 2 - ETA
  • product 3 -- ETA

 

Yammer is INCOSE's social media platform for members. Use your INCOSE-issued Microsoft credential to login and join the conversation. INCOSE credentials are in the form of first.last@incose.net or first.last@incose.buzz.   

Contact Us