The International Space Station (ISS) Program Master Integration and Verification Plan (PMI&VP) requires that the systems engineering verification team establish and implement an integrated verification measurement program. This paper captures the knowledge and experience acquired through the International Space Station systems engineering efforts to develop, implement, and report a detailed set of integrated stage verification planning and closure metrics.
Members-Only Content
This content is restricted to members only.
You must be logged in with an active membership to access this page.
Please click the link below to log in. If you do not have an account or your membership is inactive, you may need to register or renew it.