Performance-Based Earned Value®1 concepts have been applied to the development of a systems engineering metrics architecture to measure systems engineering effectiveness. Metrics for desirable program outcomes of cost, schedule, and technical quality are identified and also decomposed into their contributors.
Members-Only Content
This content is restricted to members only.
You must be logged in with an active membership to access this page.
Please click the link below to log in. If you do not have an account or your membership is inactive, you may need to register or renew it.