Systems pre-sizing involving several technical fields is generally based on a method where up-going validation phases follow down-going analysis phases. Meanwhile, the usual tools, when they exist, are often optimised to work in a single way.
Members-Only Content
This content is restricted to members only.
You must be logged in with an active membership to access this page.
Please click the link below to log in. If you do not have an account or your membership is inactive, you may need to register or renew it.