In 1989, Lockheed established a plan to develop an Integrated Systems Engineering Environment which would help us integrate and manage the requirements development process through fluid interfaces among advance design, operations analysis, and design management tools. The ultimate goal is to enable systems engineering (SE) to better meet its objective – To assure the fully integrated development of a product (under controlled cost/schedule constraints) which meets the customer’s needs.
Members-Only Content
This content is restricted to members only.
You must be logged in with an active membership to access this page.
Please click the link below to log in. If you do not have an account or your membership is inactive, you may need to register or renew it.